Showing posts with label intermodal. Show all posts
Showing posts with label intermodal. Show all posts

Friday, October 26, 2012

30 Minutes At CSX Boyles Yard and ABC Coke


My wife and I were passing through Birmingham two weeks and decided to drop off I-20 and take a quick look at CSX (nee-L&N) Boyles Yard. We were there less than thirty minutes, but got quite a little show. We started at Boyles, heard a honk from the switcher at ABC (Alabama Byproducts Company) and rushed the three blocks to shoot it, then back to the corner of Seaboard and Cedar to shoot Alabama Tennessee and Northern SD40-s. We then hopped back into the Element and headed north up I-65. It was 20-30 minutes well-spent.


CSX Boyles Yard Sign 10-13-2012


CSX facility direction sign at entry to Boyles Yard Birmingham AL 10-13-2012


CSX trespassing sign at entry to Boyles Yard Birmingham AL 10-13-2012



CSX Security Sign at Seaboard Road and Cedar Roads by CSX Boyles Yard Birmingham, Alabama 10-13-2012


Seaboard Road and Cedar St crossing at CSX Boyles Yard in Birmingham 10-13-2012


CSX #2453 SD38-2 moving south from the hump in CSX Boyles Yard Birmingham AL 10-13-2012


CSX #2452 SD38-2 moving south from the hump in Boyles Yard Birmingham Al 10-13-2012


CSXT #620139C X-Sealand Gunderson well car moving south through CSX Boyles Yard Birmingham AL 10-13-2012


CSXT #620139E X-Sealand Gunderson well car moving south through CSX Boyles Yard Birmingham AL 10-13-2012


CSXT #620139D X-Sealand Gunderson well car moving south through CSX Boyles Yard Birmingham AL 10-13-2012


CSXT #620139B X-Sealand Gunderson well car moving south through CSX Boyles Yard Birmingham AL 10-13-2012


AIGX #400052 4-bay hopper in coke service moving south through CSX Boyles Yard Birmingham Al 10-13-2012




AIGX #400080 4-bay hopper in coke service moving south through CSX Boyles Yard Birmingham Al 10-13-2012


CSXT #296612 4-bay coke hopper cut down from 6-bay wood chip hopper moving south into CSX Boyles Yard Birmingham AL 10-13-2012



CSXT #296612 4-bay coke hopper cut down from 6-bay wood chip hopper A-end moving south into CSX Boyles Yard Birmingham AL 10-13-2012


NYC #585032 X-CR 50' gondola in CSX Boyles Yard Birmingham AL 10-13-2012


TCMX #898278 X-NS 3-bay hopper converted for coke service CSX Boyles Yard Birmingham AL 10-13-2012


AOKX #494082 2-bay centerflow moving south into CSX Boyles Yard Birmingham AL 10-13-2012


TCMX #898292 X-NS 3-bay hopper converted for coke service CSX Boyles Yard Birmingham AL 10-13-2012


IFRX #867349 coke hopper X-ICG wood chip hopper moving south through CSX Boyles Yard Birmingham Al 10-13-2012


IFRX #4104 hopper moving south through CSX Boyles Yard Birmingham Al 10-13-2012


IFRX #3692 hopper moving south through CSX Boyles Yard Birmingham Al 10-13-2012


LW #600316 X-CSX coil car moving south through CSX Boyles Yard Birmingham Al 10-13-2012


PTTX #136276 flat car moving south through CSX Boyles Yard Birmingham Al 10-13-2012


ASHX #1320 3-bay centerflow moving south at CSX Boyles Yard Birmingham Al 10-13-2012


IFRX #867288 coke hopper X-ICG wood chip hopper moving south through CSX Boyles Yard Birmingham Al 10-13-2012


IFRX #867287 coke hopper X-ICG wood chip hopper moving south through CSX Boyles Yard Birmingham Al 10-13-2012



ABCX #1500 SW1500 X-SP shoving cars back at ABC Coke 10-13-2012


ABCX #1500 SW1500 X-SP switching ABC Coke 10-13-2012


ABCX #1500 SW1500 X-SP switching CSX coal cars at ABC Coke 10-13-2012


WAMX #4120 X-UP SD40-2 light move south through CSX Boyles Yard Birmingham Al 10-13-2012


WAMX #4120 X-UP SD40-2 light move south through CSX Boyles Yard Birmingham Al 10-13-2012


WAMX #4115 and #4120 SD40-2 drifting south through Boyles Yard Birmingham Al 10-13-2012


WAMX #4115 X-UP SD40-2 light move south through CSX Boyles Yard Birmingham Al 10-13-2012


ABC Coke Next To CSX Boyles Yard in Birmingham in a screen grab from Google Earth.


ABC Coke in Birmingham overhead view courtesy of Google Earth.

Saturday, September 22, 2012

NS-SP Stack Train Motive Power April 1995

The Norfolk Southern and Southern Pacific (later with Union Pacific) ran an APL stack train through New Orleans to be handed off to the SP at the joint SP-UP Avondale Yard on the west bank past the Huey P. Long Bridge. The west- and east-bound iterations of this train typically ran through Oliver Junction past Oliver Yard without stopping. 

See the SP APL schedule below courtesy of http://www.carrtracks.com/sptrl.htm


LBAVT began as the VAAVT and handled APL containers for Houston and to New Orleans for Southern Rwy train 222 to Atlanta. The trains increased in days of operation and by 1991 were operating from Long Beach Tuesday through Sunday. The AXAVT became the LBAVT in late 1991. LBAVT handled double stack and TOFC for New Orleans and connection with Norfolk Southern.
VAAVTValla200A Avondale Yard830A 385
AXAVT1Long BeachWed 1100A AvondaleSat 110P 86
AXAVT2Long BeachSat 500A AvondaleTue 410A 86
AXAVT2Long BeachSun 500A AvondaleTue 1159P 87
AXAVT5Long BeachWed 500A AvondaleFri 1159P 87
AXAVT7Long BeachFri 500A AvondaleSun 1159P 87
AXAVTLong BeachexMon 600A AvondaleexWed 220A 91
LBAVTLong BeachTuWe 700A AvondaleThFr 320A 93
LBAVTLong BeachSat 1000P AvondaleTue 320P 93
LBAVTLong BeachThFrSa 100A AvondaleSaSuMo 1020P 93
LBAVT1Long BeachThFrSa 100A ShrewsburySuMoTu 240A 94
LBAVT2Long BeachTuWe 700A ShrewsburyFrSa 640A 94
LBAVT3Long BeachSun 1000P ShrewsburyWed 640P 94
LBAVT4Long BeachTuWe 1000A ShrewsburyFrSa 640A 94


See the NS APL schedule below courtesy of http://www.trainnet.org/Libraries/Lib002/NORSTS001.TXT


APL Double-Stacks (when in seperate trains)
New#   Old#   Origin           Destination

296    722    New Orleans      Atlanta
297    719    Atlanta          New Orleans


On occasion the westbound train would stop with the tail of the train just north of Oliver Junction. An NS employee would then cut the train at a designated point. The truncated train would then proceed west to Avondale. A switcher (usually a GP38 of one sort or another) would come out from Oliver Yard and bring the intermodal cars into the yard for local business.

Sometimes the eastbound train would stop with the motive power just north of Oliver Junction. The power would then be cut off and run light into Oliver Yard to pick up additional cars to be added to the head end of the train. After re-connecting the train and bringing up the air, the train would then proceed east/north across Lake Ponchartrain and on to Atlanta.


One day I caught the power being cut off of what I presume to be #722 and brought down into Oliver Yard to pick up more APL intermodal traffic to be added for the run to Atlanta. The consist that day was SSW B40-8 #8076, WC SD45 #6554, SSW SD45T-2 #9393, and SD SD45R #7502. Below are photos of the power that day. 


SP #7502 SD45R drifts downgrade into Oliver Yard after cutting off a northbound SP-NS APL stack train New Orleans LA 04-1995


SSW #9393 SD45T-2 drifts downgrade into Oliver Yard after cutting off a northbound SP-NS APL stack train New Orleans LA 04-1995



WC #6554 SD45 drifts downgrade into Oliver Yard after cutting off a northbound SP-NS APL stack train New Orleans LA 04-1995


SP #8076 B40-8 backs a light power move south across Florida Avenue and into NS Oliver Yard after cutting off an NS-SP APL stack train New Orleans LA 04-1995